The NYC DOT sidewalk repair permit: cost, who files it, and how
Sidewalk work in New York City needs a DOT permit, at $70 for every 300 linear feet of sidewalk on one property. When a contractor does the work, the contractor must apply through nycstreets.net; a homeowner doing the work personally can apply by mail.
The permit in one paragraph
Any repair, replacement or installation of the public sidewalk in front of your property needs a DOT sidewalk permit before work starts. It costs $70 for every 300 linear feet of sidewalk on one property, and the fee also pays for the inspector who later checks the work for a violation dismissal. Corner and through lots, which front more than one street, may need more than one permit.
Who files it
| Who does the work | How the permit is obtained |
|---|---|
| A contractor | The contractor must apply online through nycstreets.net |
| The homeowner, personally | The homeowner may apply by mail |
If you hire us, we file it, because the rules require the contractor to. Ask any contractor you are comparing whether the permit is included in their price.
Applying by mail as a homeowner
DOT’s mail application needs four things:
- A completed Application for Roadway/Sidewalk Permit. If you received a violation, put the violation number on the “For the Purpose of” line.
- A notarised Affidavit of Ownership.
- A stamped, self-addressed envelope.
- A certified check for $70, payable to NYC DOT.
Mail it to: New York City Department of Transportation, Permit Management & Constructions Control, Permit by Mail, 55 Water Street, Concourse Level, New York, NY 10041.
What the permit holder has to do
The Highway Rules, 34 RCNY § 2-09, govern sidewalk, curb and roadway work. In practice, for a sidewalk repair, that means:
- Build to the specification. A single course of concrete 4 inches thick on a 6-inch foundation, and 7 inches thick in driveways and corner quadrants.
- Use pigmented concrete where required. In commercial zoning districts C4-4 through C4-7, C5 and C6, pigmented concrete is required when more than half of the sidewalk in front of a lot is replaced.
- Call 811 before digging. New York 811, which covers NYC and Long Island, must be notified at least two full working days, and no more than ten, before excavation, so utility lines are marked.
- Keep the public safe. The work area is barricaded and pedestrians are given a safe way past.
The permit and a violation
If you are repairing because of a Notice of Sidewalk Violation:
- The permit does not extend the 75-day deadline.
- After the work, the permit number is one of the details 311 asks for when you request the Sidewalk Violation Dismissal Inspection, along with the block and lot, violation number and owner contact details.
The full sequence is in our guide to clearing a violation.
Common permit mistakes
- Starting work before the permit is issued. Work in the public right of way without a permit can bring enforcement and delays.
- One permit on a corner lot. Corner and through lots front more than one street and may need more than one permit.
- Assuming the permit buys time. It does not extend a violation’s 75 days.
- Losing the permit number. You need it to request the dismissal inspection.
Permits beyond the sidewalk
- Curb cuts and driveways. A new or wider curb cut needs Department of Buildings approval and permit, not just DOT’s. See our curb cut guide.
- Tree pits and roots. Working around a city street tree can need a Tree Work Permit from NYC Parks, which Parks says is typically issued within 45 days. See our tree roots guide.
- Historic districts. Removing historic paving in some Landmarks districts needs LPC approval.
Questions we get asked
How much is a DOT sidewalk permit?
$70 for up to 300 linear feet of sidewalk for any one property. The fee covers the administrative cost and the inspector's dismissal inspection. Corner and through lots may need more than one permit.
Does the permit give me more time on a violation?
No. DOT states that a sidewalk permit does not extend the 75 days you have to repair after a Notice of Sidewalk Violation.
Can I check who has a permit at my address?
Yes. nycstreets.net lets you search the permits DOT has issued for an address or area, which also helps if a utility or contractor damaged your sidewalk.
Do I need a separate permit for a curb cut?
Yes. A curb cut needs Department of Buildings approval and a DOB permit, issued to a licensed General Contractor, in addition to a DOT permit for the work in the street.