How to clear an NYC sidewalk violation, step by step

To clear an NYC sidewalk violation, replace every flag numbered on the Preliminary Inspection Report within 75 days of the certified-mail date, under a DOT permit, then ask 311 for a Sidewalk Violation Dismissal Inspection. Once DOT accepts the repair, the County Clerk filing is cleared.

Step 1: Read the notice and find your deadline

The envelope matters as much as the letter. The 75 days you have to repair start on the date on the certified-mail receipt. If the notice was not mailed, it was posted on the property, and the posting date starts the clock. Write the deadline down now.

Three facts that surprise most owners:

  • There is no fine. A violation is DOT’s finding that the sidewalk is defective, not a penalty.
  • It is filed with the County Clerk. It stays on file until the city tells the Clerk that satisfactory repairs were made, which is why it shows up in title searches when you sell or refinance.
  • The newest notice wins. If you receive more than one, the latest supersedes the earlier ones.

Step 2: Read the Preliminary Inspection Report

The notice comes with a sketch of your frontage: the Preliminary Inspection Report. Every flag (sidewalk square) with a number on it must be replaced, and every defect listed must be corrected. Flags marked with an “X” may be replaced at no charge by the city, as decided by a DDC engineer.

Walk the sidewalk with the sketch in hand. Check the width and dimensions, and where the sketch puts trees, signs, utility caps and cellar doors. If the sketch does not match reality, go to Step 3b.

Step 3a: Check whether the repair is yours to pay for

Before spending money, rule out three situations:

  1. City tree roots at a one-, two- or three-family home. The city no longer issues violations or imposes liens on one-, two- and three-family properties where city trees alone caused the damage, and it repairs qualifying sidewalks for free through the Trees and Sidewalks Program. See our tree roots guide.
  2. Damage caused by a utility or another contractor. Document it and claim from that company.
  3. The wrong owner. If the violation was sent to the wrong owner, appeal through 311.

Step 3b: Appeal if the notice is wrong

If the defect on the notice does not match the actual condition, request a re-inspection through 311 within 75 days of receiving the notice. DOT schedules it within 180 days. A different inspector, without the first inspector’s report, does it. You get at least five days’ notice by mail, the inspector will not knock on your door, and it is the final inspection.

Step 4: Hire a contractor, or do it yourself

DOT advises hiring a contractor familiar with its sidewalk specifications and checking the licence in the DCWP database, which also shows the number and type of complaints filed against a contractor. Ask for an estimate that lists:

  • every numbered flag on the report, by number;
  • the slab: 4 inches of concrete on a 6-inch foundation, 7 inches at driveways and corner quadrants (34 RCNY § 2-09);
  • the permit, disposal and any curb work;
  • what is excluded.

Step 5: Get the permit

The permit costs $70 for every 300 linear feet of sidewalk on one property; corner or through lots may need more than one. A contractor must apply through nycstreets.net. If you do the work yourself, you can apply by mail with the application form (violation number on the “For the Purpose of” line), a notarised Affidavit of Ownership, a stamped self-addressed envelope and a $70 certified check to NYC DOT. Our DOT permit guide has the details.

Step 6: Do the work

Every numbered flag is broken out and replaced to the joint lines on a sound base, sloped to drain to the curb, and finished with a non-slip surface. Before any digging, New York 811 must be called at least two full working days ahead so utility lines are marked.

Step 7: Request the dismissal inspection

When the work is finished, contact 311 and request a Sidewalk Violation Dismissal Inspection. Have ready:

  • the permit number;
  • the property address, and its block and lot;
  • the violation number;
  • the owner’s email and phone.

On inspection day, keep the whole sidewalk visible. Cars, bins, scaffolding and building materials hide flags and can mean a repeat visit.

What happens if you do nothing

After 75 days, DOT may send its own contractor and the Department of Finance bills you. The estimate is the square footage on the report times the per-square-foot rate in the letter that came with the notice, using the 7-inch rate for driveway areas, and the final bill can include extra repairs. You then have 90 days to pay before interest accrues and a lien is placed on the property. Payment plans are available through 311. The city’s contractor work is guaranteed for 18 months.

The short version

Step What to do Deadline
1 Note the certified-mail date Day 0
2 Check the inspection report against the sidewalk Early
3 Rule out tree, utility or wrong-owner cases; appeal if wrong Within 75 days
4 Get itemised estimates listing every numbered flag Early
5 Permit filed (contractor via nycstreets.net) Before work
6 Call 811, replace every numbered flag Before day 75
7 Request the dismissal inspection through 311 After the work
Need the work done? Sidewalk violation removal — A Notice of Sidewalk Violation gives you 75 days to replace every flag DOT numbered on its inspection sketch. We price the exact flags on your report, file the permit, do the work to the city specification and give you what you need to request the dismissal inspection that clears the County Clerk filing.

Questions we get asked

Can I get more time than 75 days?

DOT states the 75-day period is the same all year and that a sidewalk permit does not extend it. If the notice itself is wrong, a re-inspection request must also be made within 75 days of receiving it.

Does a sidewalk violation have a fine?

No. There is no fine. The consequences are the County Clerk filing, which can complicate a sale or refinance, and DOT's right to do the work and bill you after 75 days.

Do I need a licensed contractor?

You can do the work yourself and apply for the permit by mail. If you hire a contractor, DOT advises choosing one familiar with its sidewalk specifications and checking their licence in the DCWP database, which also shows complaints.

What if a utility company damaged my sidewalk?

Document the damage and ask the responsible company to repair it; claims go to its claims department. DOT's permit search on nycstreets.net shows who has been issued permits at your address.

Sources

Get a free written estimate

Send photos or book a visit. You get an itemised written scope with exclusions stated, and a 2-year written warranty on our workmanship, from the day the job is signed off.